Dissertation Defence: Developing Uncertainty-Aware Immersive Digital Twins for Construction Stage
November 30 at 11:30 am - 3:30 pm

Kantheepan Yogeeswaran, supervised by Dr. Qian Chen, will defend their dissertation titled “Developing Uncertainty-Aware Immersive Digital Twins for Construction Stage” in partial fulfillment of the requirements for the degree of Doctor of Philosophy in Civil Engineering.
An abstract for Kantheepan Yogeeswaran’s dissertation is included below.
Examinations are open to all members of the campus community as well as the general public. This examination will be offered in hybrid format. Registration is not required to attend in person; however, please email qian.chen@ubc.ca to receive the Zoom link for this exam.
Abstract
Construction managers need to assess project progress, anticipate future conditions, and choose interventions as site information evolves. Yet observations can be incomplete, delayed, or inaccurate, leaving variables such as crew productivity and material delivery times uncertain. Existing construction-stage digital twins (DTs) commonly treat the current project state as sufficiently known and present forecasts or management alternatives without consistently conveying their uncertainties. This can obscure plausible current conditions and future outcomes, limiting support for situation awareness (SA) and informed decisions. This research therefore aimed to develop and evaluate an uncertainty-aware Immersive Digital Twin (IDT) framework for decision-making during construction-stage management meetings.
We formulated construction-stage planning and control as a Partially Observable Markov Decision Process (POMDP) within the Construction-stage digital twin (CDT). Hierarchical Bayesian models used expert estimates and observations to update distributions of crew proficiency and delivery transit times. To evaluate alternative mainstream estimation methods under limited data, we also developed a two-stage comparison framework that first identified the best-performing configurations within each method for predicting repetitive task durations, then compared their performance. Samples from the updated distributions formed a particle-based belief over plausible current project states. A resource-constrained project scheduling simulator propagated these states under candidate actions to generate possible future trajectories. Partially Observable Monte Carlo Planning (POMCP) used the simulator to solve the POMDP, supporting sequential management recommendations and uncertainty-aware what-if analyses. Finally, an interactive mixed-reality interface communicated these outputs through three-dimensional project models, dashboards, and uncertainty representations.
The two-stage framework provided a systematic approach for comparing estimation methods across varying data availability, prior information, and prediction requirements. In a simulated high-rise construction, calibrated POMCP achieved higher mean returns than the other six benchmark policies under matched-model conditions. Participants valued the developed interface’s support for understanding projected future conditions and evaluating management actions, while expressing concerns about the learning required for independent use. Overall, the framework demonstrates the feasibility of linking uncertainty estimation, probabilistic state inference, sequential decision support, and immersive communication, while highlighting the need for real-world validation and objective assessment of SA and decision performance.